Since DASH7 began, we’ve provided our services to a variety of clients. On every project we undertake, our most important objective is to relate with clients and understand their core necessities and goals.  DASH7 solves each client’s issues by providing a comprehensive approach backed by our team of experienced professionals. Our process fosters collaboration and innovation to ensure we not only understand the core needs of clients, but also help them develop successfully. Below are some examples of the work we’ve done - take a look, and get in touch to learn more.

PEMEX - AYIN - ALUX PIPELNE LATERAL BUCKLING ANALYSIS
Lateral buckling FEED and detailed engineering of the 20 inch oil export pipeline from AYIN to ALUX field on behalf of PEMEX, Bay Of Campache, Mexico.

PEMEX - XIKIN A - XANAB C INFIELD PIPELINE UHB / OOS ANALYSIS
Pipeline post installation out-of-straightness analysis (OOS) / UHB studies for the 12km x 20" multiphase pipeline for PEMEX, Bay of Campache, Mexico.

PEMEX - XANAB C - XANAB D INFIELD PIPELINE UHB / OOS ANALYSIS
Predictive study to estimate required rockdump and concrete mattresses for UHB mitigation and pipeline post installation out-of-straightness analysis (OOS) studies for the 5.8km x 20" multiphase pipeline for PEMEX, Bay of Campache, Mexico.

PING PETROLEUM - DE-SOURING PROJECT DESKTOP STUDY
Engineering study to assess and conclude the overall performance and evaluation of project success, identify best practices, resolve all other open issues within the project.

PEMEX - 20” PIPELINE PREDICTIVE UHB AND ON-BOTTOM STABILITY REVIEW
UHB predictive studies to estimate rock tonnage required for buckling mitigation and concrete weight coating design for for the 22km 20" infield line from Tetl-A to Pokche-A.

PING PETROLEUM - SUBSEA PIPELINE DEBOTTLENECKING PROJECT DESKTOP STUDY
Desktop study to conclude and summarise all completed work scope to-date. 

MICOPERI - ABKATUN-N1 PLATFORM - BATAM A PLATFORM PIPELINE DNVGL LCC & DCC STUDY
Optimisation engineering studies to assess and compare client design specification versus DNVGL-ST-F101 LCC and DCC combine loads for 12.1 km x 12"gas pipeline during pipelay.

PEMEX - ELM-5 to BATERIA RABASE PRELAY SEABED INTERVENTION WORK (ROCK BERM) DESIGN
Design and engineering of seabed intervention works required to support the 16" infield pipeline over the rock outcrops without excessive free span in-situ. Engineering of concrete weight coating to ensure pipeline stable exposed to environmental wave and current loads.

PEMEX - 12" GAS PIPELINE (PB-KU-M TO PP-MALOOB-E) ROCK BERM STABILITY ANALYSIS
DASH7 was contracted by Premaducto to evaluate the stability of the rock berm and the 12" pipeline (resting on the rock berm) to ensure no hydraulic instability of the armor layer and pipeline are stable in-situ when subjected to waves and currents.

PEMEX - POKCHE C - POKCHE A OUT OF STRAIGHTNESS (OOS) ANALYSIS
Pipeline post installation out-of-straightness analysis (OOS) / UHB studies for the 2.5km x 16" gas pipeline for PEMEX, Bay of Campache, Mexico.

PEMEX - YAXCHE C - YAXCHE A OUT OF STRAIGHTNESS (OOS) ANALYSIS​
Pipeline post installation out-of-straightness analysis (OOS) / UHB studies for the 2.7km x 16" gas pipeline for PEMEX, Bay of Campache, Mexico.

ANASURIA - WATER TO GAS PIPELINE RE-INJECTION FEASIBLITY STUDY​

Feasibility study to evaluation conversion of the existing WI pipeline for dry-gas reinjection. The socpes of the project involced defination of pipeline MAOP, material compability review and the associated topsides pipework and subsea system modifications.