AKAL NW 501 Conductor Risers Detailed Engineering

Year:
2023

Client:
PEMEX

Region:
GOM

Business Unit:
Subsea / Pipeline

DASH7 Ltd in collaboration with a local Mexico Engineering House is contracted by PEMEX to carry out a detailed engnieering to confirm the stress and fatigue level of the conductor risers system.

Project Background

​

In supporting Pemex Exploration and Production's strategy to produce a new oil field as soon as possible, the Akal NW field was initiated as an early production project by PEMEX in October 2022.

​

Problem Definition​

​

To expedite the production as soon as possible, a temporary export system is required to deliver the product from the AKAL 501/502/502S surface wells to the existing 36” L175 via hot tapping. Due to the long lead time required for the fabrication (permanent) export system, a temporary solution was adopted by PEMEX while waiting on the delivery of the jacket and export riser. The temporary concept solution includes utilising the jack-up rig to support the conductors riser with mezzanine deck and export the production via a clamp on J-tube and flexible hose. 

 

Scope of the Studies:

​

  • Conductor risers in-place stress analysis

  • Conductor risers fatigue assessment

  • Jack-up support structure integrity assessment

  • Mezzanine deck stress and fatigue assessment

​